Row of 5-axis CNC machines on the Fenva Precision production floor

Ordering process

Simple, efficient ordering from China.

Eight clear steps from your first file to delivery at your door, with quotes in 48 hours, engineering support and full traceability along the way.

Step by step

From files to delivery, in eight steps

Typical lead times are shown so you can plan. Your project manager keeps you updated at each stage.

1

Submit your files

Send 3D and 2D files with material, finish and quantity. For the most accurate quote, send both a 3D STEP and a 2D PDF with tolerances: 3D only is machined to ISO 2768-m general tolerance, 2D only is priced as an estimate until we receive the model. Files are kept confidential; NDA on request.

2

Specify requirements

Confirm quantity, material, tolerances and finishes. We can quote multiple options on request.

3

Review quotation

within 48 h

You receive a detailed, line-item quote with lead time, typically within 48 hours. Have a target price? Include it — quotes converge faster, and if it’s within reach we’ll often just meet it.

4

Engineering support & DFM

1–3 days

DFM feedback on geometry, tolerances and material to cut cost and risk before machining begins.

5

Confirm & lock in lead time

Quotes are valid for 30 days; lead time starts on deposit. We confirm the schedule with you.

6

Sampling & approval

~10 business days

On request, we produce samples for your approval. Samples are charged separately, typically about ten business days.

7

Manufacturing

Material traceability, precision machining, in-process QC, finishing and packaging, with progress updates throughout.

8

Shipping & logistics

Protective packaging and worldwide shipment by air, rail or sea, DDP available for selected destinations.

Inside production

What steps 7 and 8 look like on the floor

Spindle head and way covers during a coolant-flooded machining pass

Machining, under coolant and control

During manufacturing, the spindle head and way covers run a coolant-flooded pass, holding tolerance while in-process QC checks dimensions against the drawing.

Finished, bagged and staged for shipping

Before step 8, finished anodised components are individually bagged and staged on the rack for final inspection and protective packaging, ready for worldwide shipment.

Finished anodised aluminium components, individually bagged and staged for inspection and shipping

Shipping & logistics

Choose the speed that fits your program

Transit times are typical ranges and vary by destination and customs. We'll confirm options and cost with your quote.

Typical transit times by method
MethodTransit timeNotes
Air freight7–12 daysFastest option
Railway25–35 daysAsia & Europe
Sea freight39–65 daysMost economical
DDPOn requestAvailable for selected destinations

DDP (Delivered Duty Paid) means we handle freight, duties and customs to your door where available.

Grid of precision CNC-machined production parts at Fenva Precision

Get started

Ready to start your order?

Send your drawings and our engineering team will quote within 48 hours, no minimum order.

Your drawings stay confidential.